Taken from the breezeway on HMAS Success whilst they were turning the ship. During the later stage of the refit they needed bring the starboard side of the ship along the dock. Tugs are needed when in dock to do this, apart from the fact that the engines hadn't been run at this point.
Both Naval and Port tugs were called in to turn the 18,000t of ship. The 2 powering towards us at the Port tugs that have come from the western harbour near Walsh Bay.
Even Celebrities Can Fail at Email
7 hours ago